Well I am feeling kind of bummed out right now and hoping that with the sunrise and a new week ahead that things will progress along more this week than last.
Once again we had lots of rain, which of course delayed much of the work that is necessary to be completed outside. What does upset me is that there are things inside that still could have been completed but have been done as yet. I doing my best to be patient and understanding but at times I find it difficult because patience is not one of my better personality traits. I have to remember that my house is not the only construction job that they have going at this time. There is another little house they are working on which once they got into it turned out to have some major problems that no one had counted on. Consequently, more time and repairs are needed there than originally anticipated. The owner of the home moved out while they are working on the house and it is important to get him back in as soon as possible so of course the house has to take priority.
There were a few disappointments this past week. The electrician came back and changed out the 220 cord and outlet. The cord he originally used did not meet our city's code requirements. They also added the two electrical outlet switches to the lights out in the garage and storage area rather than leave them on pull chains. The City Electrical Inspector arrived on Friday and they still didn't pass final inspection because they forgot to change out the plug on the patio outside wall which was to be a GFI outlet! So once again they will have to return and change that out and call for an inspection again.
The plumbing inspector still hasn't come out to check the changes that he requested to be made on the installation of the water heater. In fact I don't even know if that has been requested to be done yet. I need to call Monte!
One of the men brought over the paint for doing the outside. I was kidding around with him and stated that maybe I needed to check it out just to make sure that they brought the right colors and it is a good thing I did because the gray paint was not the right shade. I had given them a very dark shade of gray, like deep charcoal gray and the color on the top of the can was very light gray! At least the light green shade for the shutters and trim was the right color.
Today I am going to take time to rearrange my bedroom back to where it belongs. I had pushed my bed over to the outside corner of the room so that they would have unobstructed access to both the windows in that room. I will need to once again unload the 2 bookcases before attempting to move them but that is not that big of a chore. It will seem good to once again put the room back in order. I notice that I am going to have some touch up painting to do...... now where is that can of raspberry color paint????
Living A Simplified Life!
Showing posts with label electrical. Show all posts
Showing posts with label electrical. Show all posts
Monday, September 28, 2009
Friday, September 18, 2009
More Progress Made
The rest of the windows were installed yesterday! Of course I've already had one cat put little nose smudge prints all over the nice clean glass because she thought she could just jump on outside! The screens are so fine, you have to look super close to even realize that they are there! Little Bit saw a squirrel out on the lawn and I guess she figured she was going to have it for lunch. Boy did she get a surprise when her nose hit that glass. She ended up shaking her head as if in disbelief.
Friday, oh gosh it is Friday 4:33AM and I'm still up, the electrician is to return today to redo the part of the wiring that didn't pass inspection. Hopefully we will be able to get it all completed and then get the inspector back out here so that the dryer can be hooked up.
I have almost finished putting down the vinyl flooring in the laundry room. I am going to have to ask some of the fellas to help me move the washer over so I can complete the flooring under where it sits. I thought I was going to be able to move it by myself, but found out I am not quite as strong as I once was. The reality of old age is sitting in on me I am afraid.
I guess I better shut this down and get to bed if I am going to make it up in the next 3 hours to greet the day and the repair men!
Friday, oh gosh it is Friday 4:33AM and I'm still up, the electrician is to return today to redo the part of the wiring that didn't pass inspection. Hopefully we will be able to get it all completed and then get the inspector back out here so that the dryer can be hooked up.
I have almost finished putting down the vinyl flooring in the laundry room. I am going to have to ask some of the fellas to help me move the washer over so I can complete the flooring under where it sits. I thought I was going to be able to move it by myself, but found out I am not quite as strong as I once was. The reality of old age is sitting in on me I am afraid.
I guess I better shut this down and get to bed if I am going to make it up in the next 3 hours to greet the day and the repair men!
Friday, September 4, 2009
Shall We Dance?
Two Steps Forward and One Step Back!
We had both the electrical and plumbing inspectors scheduled to come out on Wednesday. Both showed up but I had run to the store quickly at about 3:30 posted a note I would be back in 5 and wouldn't you know it, the electrical inspector shows up while I am gone and we had to reschedule!
The plumbing inspector passed almost everything, but there were a few minor things that he needed to go over with Keith at the city about.
We rescheduled the electrical inspection for Thursday and then they called and asked to reschedule for Friday.
The electrical inspector just left and will be getting with Keith also regarding a couple of things that he wishes to discuss, so no approval there as yet.
We had both the electrical and plumbing inspectors scheduled to come out on Wednesday. Both showed up but I had run to the store quickly at about 3:30 posted a note I would be back in 5 and wouldn't you know it, the electrical inspector shows up while I am gone and we had to reschedule!
The plumbing inspector passed almost everything, but there were a few minor things that he needed to go over with Keith at the city about.
We rescheduled the electrical inspection for Thursday and then they called and asked to reschedule for Friday.
The electrical inspector just left and will be getting with Keith also regarding a couple of things that he wishes to discuss, so no approval there as yet.
Labels:
city inspections,
electrical,
plumbing,
remodelig
Thursday, August 27, 2009
Another Step Towards Completion!
Well today marked the final day for the Red Hot men to be here!
What a great couple of guys and they do terrific work.
They popped in here about 10 AM or so this morning and were finished about 3 PM
Today they had to get back up into the hot, insulation itchy attic and run the wiring for the patio area and the garage work. Outlets needed to be installed and light fixtures as well as a new plug for the garage door opener unit. The sad part is, I was told that the electric opener unit itself is broken and needs to be either repaired or totally replaced and the door itself is hanging up on the track because of the center arm to the opener and the side hinges don’t want to turn the right way to make the bend to go up!
If we end up having thunderstorms tomorrow, which it looks like we may well have, I probably will have a crew of carpenters here doing some work. They would be able to work out on the patio, because it has a roof over it and install the outside siding that needs to go on the new wall they put in. They could come inside and cut the dryer vent hole and also the access panel area that has been decided upon for the closet where the water heater will go so that we can have proper access to the top of the tank if it needs repairing.
There is also a small area of sheetrock work that needs to still be done on the living room wall and then a repair area in the bathroom which got damaged during this remodeling.
As things stand now, it will probably be Saturday before the roofers can get here because of rain predictions; otherwise it will be Monday or Tuesday.
The new double pane windows should be here sometime early next week and we should be able to get them installed in a day if the weather holds out for us later on midweek.
Then there will be a small amount of gutter work to be done and painting and we will be finished!
I truly feel we will finish up long before our deadline date. These workers have been absolutely fantastic!
The General Contractor has several other jobs going at the same time, another here in Norman and at least one or two others up in Woodward. He is juggling crews around so that all of the subcontractors follow each other in logical order and there are no delays in work schedules. The unpredictable weather we have had this month is the only real hindrance. Much to everyone’s surprise we have had an abundance of thunderstorms this August and normally this is Oklahoma’s driest month!
I know most people don’t like remodeling jobs but I have to tell you, I have gone through several as well as build my own home in Texas and this has by far been the easiest one so far.
Some things that you will need to look at when choosing a contractor:
1. be sure that they are licensed and bonded in your state.
2. Ask for references of past work they have completed and contact the people about their workmanship and promptness in completing the job.
3. Find out if your contractor will be doing all the work themselves or if there will be subcontractors that you will also be working with. Make sure that all are licensed and bonded.
4. Find out if any special permits are needed in your city and if they will obtain them or if you will be required to obtain them.
5. Have a contract which you both will sign and have copies off, showing the work in detail as to what is to be done for the amount of money you will be spending. Have a starting date (work must start within X amount of days of signing this contract) and work must be completed within a given period of days. You may want to add a couple of extra “bad weather days” into the contract depending on the time of year the work is to be performed.
If you have a General Contractor with Sub-Contractors
1. be sure that any changes in the contract be they wanted by you or by the subcontractor, need to be approved and cleared through the General Contractor.
2. If for any reason you are not satisfied with the work of any of your sub-contractors, you need to contact the General Contractor to settle the problem.
I have made it a point to ask each of the subcontractors for one of their business cards which I will be keeping on file. I will also be writing a note, to Monte my General Contractor at the completion of this job discussing with him about each of his subcontractors and their work. At this point in time, I have already talked to him about Hawk Mechanical and Red Hot Electrical as being top notch in professionalism of personal manor and quality of work. I also told Monte that I have already written them up on my blog and his carpenters, roofers, gutter company and painters will also have promotion here also. I am looking forward to working with each and every crew because if what I have already seen is any indication of the types of people Monte has working for him, they will also be top notch!
What a great couple of guys and they do terrific work.
They popped in here about 10 AM or so this morning and were finished about 3 PM
Today they had to get back up into the hot, insulation itchy attic and run the wiring for the patio area and the garage work. Outlets needed to be installed and light fixtures as well as a new plug for the garage door opener unit. The sad part is, I was told that the electric opener unit itself is broken and needs to be either repaired or totally replaced and the door itself is hanging up on the track because of the center arm to the opener and the side hinges don’t want to turn the right way to make the bend to go up!
If we end up having thunderstorms tomorrow, which it looks like we may well have, I probably will have a crew of carpenters here doing some work. They would be able to work out on the patio, because it has a roof over it and install the outside siding that needs to go on the new wall they put in. They could come inside and cut the dryer vent hole and also the access panel area that has been decided upon for the closet where the water heater will go so that we can have proper access to the top of the tank if it needs repairing.
There is also a small area of sheetrock work that needs to still be done on the living room wall and then a repair area in the bathroom which got damaged during this remodeling.
As things stand now, it will probably be Saturday before the roofers can get here because of rain predictions; otherwise it will be Monday or Tuesday.
The new double pane windows should be here sometime early next week and we should be able to get them installed in a day if the weather holds out for us later on midweek.
Then there will be a small amount of gutter work to be done and painting and we will be finished!
I truly feel we will finish up long before our deadline date. These workers have been absolutely fantastic!
The General Contractor has several other jobs going at the same time, another here in Norman and at least one or two others up in Woodward. He is juggling crews around so that all of the subcontractors follow each other in logical order and there are no delays in work schedules. The unpredictable weather we have had this month is the only real hindrance. Much to everyone’s surprise we have had an abundance of thunderstorms this August and normally this is Oklahoma’s driest month!
I know most people don’t like remodeling jobs but I have to tell you, I have gone through several as well as build my own home in Texas and this has by far been the easiest one so far.
Some things that you will need to look at when choosing a contractor:
1. be sure that they are licensed and bonded in your state.
2. Ask for references of past work they have completed and contact the people about their workmanship and promptness in completing the job.
3. Find out if your contractor will be doing all the work themselves or if there will be subcontractors that you will also be working with. Make sure that all are licensed and bonded.
4. Find out if any special permits are needed in your city and if they will obtain them or if you will be required to obtain them.
5. Have a contract which you both will sign and have copies off, showing the work in detail as to what is to be done for the amount of money you will be spending. Have a starting date (work must start within X amount of days of signing this contract) and work must be completed within a given period of days. You may want to add a couple of extra “bad weather days” into the contract depending on the time of year the work is to be performed.
If you have a General Contractor with Sub-Contractors
1. be sure that any changes in the contract be they wanted by you or by the subcontractor, need to be approved and cleared through the General Contractor.
2. If for any reason you are not satisfied with the work of any of your sub-contractors, you need to contact the General Contractor to settle the problem.
I have made it a point to ask each of the subcontractors for one of their business cards which I will be keeping on file. I will also be writing a note, to Monte my General Contractor at the completion of this job discussing with him about each of his subcontractors and their work. At this point in time, I have already talked to him about Hawk Mechanical and Red Hot Electrical as being top notch in professionalism of personal manor and quality of work. I also told Monte that I have already written them up on my blog and his carpenters, roofers, gutter company and painters will also have promotion here also. I am looking forward to working with each and every crew because if what I have already seen is any indication of the types of people Monte has working for him, they will also be top notch!
Labels:
electrical,
remodeling,
rewiring,
subcontractors
Subscribe to: